HomeNewsPhotos

Photos

Operations Building Construction Site
Construction progresses at the site of the future 100th Fighter Squadron operations building, February 21, 2019 at Dannelly Field, Ala. The 23,000 square foot facility will include simulator bays and secure areas to facilitate the future F-35A mission. (US Air National Guard photo by Jared Rand).

Download Image: Full Size (1.68 MB)
Tags:
Photo by: Jared Rand |  VIRIN: 190221-Z-EH881-1001.JPG